The company has contracted and completed several projects in various regions in Libya since the year 2005.
Projects in 2005
Insulation works of air duct for the central air conditioning/ Alhawary hospital (Benghazi)/ for Malta Max Company.
Construction of oil tank/ Mlite / for Italian oil Bentini.
Mechanical works, such as: changes the Valves, lavatory, measuring watches and Pumps, and sand blasting and painting works as per the specification of Azzawiya oil refining company./ Al-Samah field/ for Waha Oil Company.
Electrical works And assembling of an air conditioning devices/ Central Libya Bank in Benghazi/ for Senchem Italian company.
Projects in 2006
Prefabrication and welding of pipe work in carbon steel and others work in stainless steel of different diameters, and making an assembling works inside the factory/ Misurata steel & iron factory./ for Mediterranean Progetti Co.
Fabrication and welding of whole Oxygen line for 2 Km distance And Diameter of 6 & 4 m and fixing it on an iron bridge and painting of the second face only/ Misurata steel & iron factory./ for Italian Techno Mentajy.
Construction of a small room for electrical generator and assembling the generator and made all the electrical extensions & conductions/ Navy livening study center at Benghazi/ for Navy livening study center.
Sandblasting and Painting for two oil tanks/ El Bregha company store at Azzawiya/ for Spanish Ripson And Cyprian J&P.
Insulation works by thermic wool and aluminum (Designing & construction)/ Al- Mabrouk field/ for French Total And Cyprian J&p.
Fabrication, assembling, and welding works for the barrels of fibre glass which related to the fire lines./ Al- Mabrouk field/ for French Total And Cyprian J&p.
Different Mechanical works & Designing and welding works/ Azzawiya electrics station/ for Korean Hyundai company.
Lying of the electrical cables which joint between the main station feeder and the sub- station./ Garuness University at Benghazi/ for Ishbielia Company – Gharuness University.
Projects in 2007
Supply technical and financial manpower for one year/ Azzawiya refinery/ for Azzawiya oil refining company.
Projects in 2008
The replacement of the old M.V.11 KV power cables by a new one./Azzawiya refinery/ for Azzawiya oil refining company.
Erection of roof insulation for reduced crude tank 101 A by using wool rocky and aluminum sheets/ Benghazi Asphalt Plant/ for Azzawiya oil refining company.
Projects in 2009
Supply and installation of a custody -Inventory tank gauging system/ Azzawiya refinery/ for Azzawiya oil refining company.
Supply technical and financial manpower for one year/ Azzawiya refinery/ for Azzawiya oil refining company.